ToH Logo

Trail Connectivity Planning Survey

  • Spanish
  • Chinese
  • Tagalog
  • Vietnamese
  • French
  • Korean
  • German
  • Arabic
  • Russian
  • Italian
  • Portuguese
  • Hindi
  • Polish
  • Japanese
  • Urdu
  • Persian
  • Gujarati
  • Greek
  • Bengali
  • Panjabi
  • Telugu
  • Armenian
  • Hebrew
  • Hmong
  • Haitian Creole
  • Align Left
  • Align Center
  • Align Right
  • Align Justify
  • Default
  • Lower Alpha
  • Lower Greek
  • Lower Roman
  • Upper Alpha
  • Upper Roman
  • Default
  • Circle
  • Disc
  • Square
  • Normal

  • Headline

  • Subhead 1

  • Subhead 2

  • Hyperlink

June 16, 2023

The Town of Hinton is collecting resident feedback about trail connectivity to ensure that we are meeting the needs of the community.

The Town aims to develop a 5-Phase Trail Connectivity Plan, relying on the trail classifications outlined in the Town’s trails Level of Service Policy and the Parks, Open Space, and Trails Master Plan. The Parks, Open Spaces, and Trails Master Plan (POST) provides a trails inventory and identifies areas of missing trail connections that currently limit the ability to traverse Hinton via the trail network.

Here's where YOU come in!


We want to know your thoughts and what you'd like to see for the Future Trail Connectivity Plan. Take our 10-minute survey today!

TAKE THE SURVEY TODAY!


click here

Share on Facebook
Share on Twitter
Share via Email

Copyright © 2023 Town of Hinton. All Rights Reserved.
131 Civic Centre Rd Hinton, AB T7V 2E5

Powered by
CivicSend - A product of CivicPlus