Road Projects & Policies
Emergency Numbers
Emergency numbers for Highway 16 and Highway 40 road concerns call Ledcor 1-866-453-3267
For in Town road concerns contact Infrastructure Services at 780-865-2634
Both these lines are answered 24 hours.


Road Policies
  • Snow Removal Read the Snow Removal Policy which provides street sanding, snow plowing, and snow removal priorities for Hinton streets.
  • Street Sweeping Read the Street Sweeping Policy document which provides goals and priorities for street sweeping and cleaning practices in Hinton.

Road Projects

Switzer Drive Water Main Upgrade – Phase l and ll
The Water Distribution System Master Plan identifies that the existing water lines in this area (designed in the 1950’s) have inefficient pumping capacity to meet the “peak day” water demands and adequate fire flows to the west part of the Mountain View area.   This project supports future phasing of the water lines along Gregg Avenue to Terrace Heights (as development occurs).   

In order to bring the system up to today’s standards, upgrades are required to the existing water lines and replacing the mechanical system within the Switzer Pumphouse.   This project has been undertaken in two phases:

Phase l was completed 2010. This phase focused on replacing and upgrading the water lines on Switzer Drive from the intersection of Pembina Avenue to Highway 16.

Phase ll remains in progress.    This phase focuses on:

  • replacing the water line on Gregg Avenue from the East crossing the Switzer Drive intersection to the corner (FasGas corner).
  • boring and installing an encased watermain line under the CN railroad and Highway 16.  
  • installation of natural gas line under the CN railroad and Highway 16 that will allow the Switzer Pumphouse system to operate in the event of a power outage.
  • upgrading and replacing the mechanical system of the Switzer Pumphouse.

The installation of the water lines and restoration of the road surface was completed in November, 2011.   The contractor will be on site in spring of 2012 to complete deficiencies, reinstate the pedestrian trail and seeding of the slope along Highway 16.

The upgrades and mechanical replacements being made to the Switzer Pumphouse are currently in progress.  


Click here to view the Site Plan or for more information contact the Capital Projects Coordinator at 780.865.6047.

Woodley Drive East Road Improvements
This project was completed in fall of 2011 and incorporates local road improvements consisting of curb and gutter, along with sidewalks and road widening along Woodley Drive from Highway 16 to Guimond Place.   The contractor will be completing deficiency work and completing the landscaping in spring of 2012.

For more information contact the Capital Projects Coordinator at 780.865.6047.

 